Photovoltaic Technology Overview
Overhead flat-lay of solar panel cells arranged in a neat grid, deep blue tones with clean charcoal borders, calm and technical mood

Solar energy sources, inverter technology, and installation know-how from SMA Solar Technology AG

Solar is Future gathers practical information on solar energy sources, photovoltaic technology, installation design, investment considerations, and recycling — built around the products and manufacturing experience of SMA Solar Technology AG, founded in 1981 in Niestetal, Germany.

Products Built on Inverter Leadership

SMA is described as the worldwide leader in PV inverter manufacturing, offering inverters suited to systems from single residences to large commercial installations. High efficiency and dependable data communication for system monitoring are central to the product range.

Sunny Boy
Sunny Central
Sunny Island
Sunny Beam
Sunny WebBox
Sunny Portal

See the full product overview →

Recognition for Quality

Stiftung Warentest

SMA products have been recognized as test winners at the German Product Standards Institute's Stiftung Warentest, a certification tied to Germany's most important quality seal.

Manufacturing Standard

Key manufacturing steps are completed in-house in Germany, supporting SMA's stated aim of top-quality products at competitive prices.

Company Motto

"Let's be realistic and attempt the impossible!" — the guiding motto behind SMA's approach to inverter development since 1981.

What the Portal Covers

Average annual energy exposure across the United States ranges from roughly 950 to 2,150 kWh/m², making solar power a viable option in most regions of the country. See the Energy Source and FAQ pages for details.

Questions About Solar Technology?

Use the contact form on the Solar is Future portal to submit questions or comments about photovoltaics, SMA products, or installation topics. Data submitted is used only to process your request.

SMA America, LLC
6020 West Oaks Blvd, Rocklin, CA 95765, U.S.A.
Tel. +1 916 625 0870  ·  Fax +1 916 0871
Email: info@solar-is-future.com

Go to Contact Page
Bright blue sky with white clouds and a warm sun flare over an open empty background, uplifting and airy mood

Sizing Overcurrent Protection for Solar PV Systems

A photovoltaic system needs carefully selected overcurrent protection to limit damage from short circuits, cable faults and unexpected reverse currents. Fuses, circuit breakers and protective switching devices must suit the electrical characteristics of the array, inverter and building supply rather than being chosen by habit or by the nominal panel wattage alone.

Sizing overcurrent protection devices for solar PV systems involves more than matching a breaker to a cable. The design must consider short-circuit current, continuous operation, conductor installation conditions, device voltage ratings, fault levels and the maximum protection permitted by the module manufacturer.

Australian installations also operate across a wide range of conditions. A rooftop in Cairns can experience high temperatures and intense sunlight, while a system in Melbourne may face cooler mornings but substantial seasonal variation. The design must comply with current Australian requirements and be completed, tested and certified by appropriately licensed professionals.

Why Protection Sizing Matters

Solar modules produce current whenever light reaches them. Unlike a conventional generator, a PV array has limited but persistent fault current, and its output does not automatically disappear when a breaker is opened. A fault can continue while daylight is available, making correct isolation and overcurrent protection essential.

The main purpose of an overcurrent protective device is to interrupt excessive current before it overheats a conductor, damages insulation or creates an ignition risk. On the DC side, protection may also prevent healthy strings connected in parallel from feeding fault current into a damaged string.

A device that is too small may nuisance-trip during normal operation, particularly on a hot Australian summer day when irradiance is strong. A device that is too large may fail to protect the cable or module wiring. Both choices can compromise safety and system availability.

Map The Current Paths

Begin with a single-line diagram showing every possible source of current. A typical grid-connected system includes PV strings, string fuses or a combiner, a DC switch-disconnector, the inverter, an AC isolator, a switchboard circuit breaker and the distribution network. Battery storage introduces further current paths and requires separate consideration.

Parallel strings are especially important. One string’s normal operating current may be modest, but several healthy strings can feed current backwards into a faulted string. The required string protection therefore depends on the number of parallel circuits, module ratings, cable ratings and the maximum series fuse rating stated on the module datasheet.

Charge controllers in stand-alone systems need similar care. Their input and output sides can have different current limits, and battery banks can deliver very high fault current. A useful explanation of how a regulator manages charging is available through this charge controller guide, although final device selection must follow the actual equipment documentation and Australian installation rules.

Calculate The DC Side

The first calculation normally starts with the module short-circuit current, Isc. Designers apply the relevant continuous-current and environmental adjustment factors required by the applicable standard, then compare the resulting design current with the cable ampacity and protective device rating. The precise calculation method should be taken from the current edition of AS/NZS 5033 and the equipment manufacturer’s instructions.

The overcurrent device must be rated above the expected operating current while remaining low enough to protect the smallest conductor in the circuit. It must also stay within the module’s maximum series fuse rating. A common error is to select a fuse based only on the inverter’s maximum input current, ignoring the array configuration and reverse-current exposure.

Voltage selection is equally important. The protective device must withstand the maximum possible DC voltage of the string, including the lowest expected module temperature. Open-circuit voltage rises in cold conditions, so a string that appears acceptable on a mild day may exceed a device’s rating in alpine Victoria or the Snowy Mountains.

PV fuses are usually designed specifically for DC photovoltaic duty, often with a gPV characteristic. A standard AC circuit breaker is not automatically suitable for a high-voltage DC circuit because DC arcs do not naturally extinguish at a current zero in the same way as AC arcs.

Select Conductors And Devices Together

Cable ampacity is affected by conductor size, insulation temperature rating, bundling, conduit, roof-space temperature, installation method and exposure to sunlight. The protective device rating must not exceed what the cable can safely carry after all relevant derating factors have been applied.

Rooftop temperatures can be severe in Australia. A cable passing through a low-clearance metal roof in western Sydney or Adelaide may operate at a much higher ambient temperature than the weather forecast suggests. This can reduce its current-carrying capacity and alter the appropriate fuse or breaker size.

Check the device’s rated voltage, continuous current, breaking capacity, polarity requirements and terminal compatibility. DC isolators must be suitable for the number of poles, operating voltage and circuit arrangement. The enclosure should also match the location, including ultraviolet exposure, moisture and dust.

Product documentation is particularly valuable when comparing inverters and system components. SMA’s solar product range provides manufacturer information that can help designers identify inverter input limits, switching arrangements and installation documentation before finalising protection.

Account For Australian Conditions

Australian PV design is governed by standards and network requirements that may change over time. AS/NZS 5033 addresses PV array installation, while AS/NZS 3000 covers general electrical installations. Grid-connected inverter systems also need to meet the applicable requirements of AS/NZS 4777.1 and the local electricity distributor.

The distributor matters because export limits and connection procedures differ. A system in Queensland may be assessed under Energex or Ergon requirements, while a Victorian installation may involve AusNet, CitiPower, Powercor or United Energy. In New South Wales, the relevant network may include Ausgrid, Endeavour Energy or Essential Energy. These requirements can affect inverter settings, switchboard arrangements and approval documentation.

Bushfire-prone areas, coastal properties and remote installations create additional design concerns. Salt air around Newcastle, Brisbane’s bayside suburbs or Perth’s coast can accelerate corrosion, while dusty regional sites may require more frequent inspection. In rural areas, long cable runs can increase voltage drop and fault-loop impedance, making device selection and testing especially important.

Australian terminology can also obscure responsibility. A homeowner may ask a “sparky” to fit a larger breaker because an existing one trips, but simply increasing its rating is unsafe unless the cable, inverter output and fault protection have all been reassessed. Only an appropriately licensed electrician should alter fixed wiring or protective equipment.

Coordinate AC And Inverter Protection

The inverter’s AC output current is calculated from its rated output power, phase arrangement and nominal supply voltage. The selected AC circuit breaker must protect the cable while accommodating the inverter’s maximum continuous output and any manufacturer-specified requirements. A breaker should not be sized from the PV array’s DC capacity alone.

AC protection must coordinate with the switchboard, main switch, distribution equipment and any existing loads. In a busy household switchboard, the available fault current and space for additional devices may affect the design. Solar export can also change current flow through busbars and conductors, so the board must be assessed as a complete assembly.

Residual-current protection is a separate function from overcurrent protection. RCD requirements depend on the inverter design, circuit arrangement and applicable standards. Some inverters include residual-current monitoring, but that does not automatically remove every RCD obligation.

The inverter’s internal protection is not a substitute for all external devices. Follow the installation manual for recommended upstream fuses, breakers, isolators and surge protection. Coordination avoids unnecessary trips while ensuring that the nearest suitable device clears a fault quickly.

Verify, Document And Maintain

Before energisation, the installer should confirm polarity, insulation resistance, continuity, operating voltage, isolation points, torque settings and protective device ratings. Labels and diagrams should clearly identify the array, inverter, battery equipment where fitted, and all points that may remain energised in sunlight.

A commissioning record should include module and inverter details, string configuration, cable sizes, fuse ratings, breaker ratings, test results and any network approval conditions. This information helps a future electrician understand why a particular device was selected rather than replacing it with a visually similar component.

Periodic inspection is valuable after storms, roof work, renovations or changes to the switchboard. Look for heat damage, discolouration, water entry, loose covers and damaged insulation, but do not open live equipment. In remote Australia, maintenance intervals may need to reflect dust, vermin, long travel distances and limited access to qualified technicians.

Protection location Main hazard addressed Key sizing inputs Typical verification
Individual PV string Reverse current into a faulted string Module Isc, parallel string count, maximum series fuse rating Polarity, fuse type, current rating and DC voltage rating
Combiner or array output Cable overload and array fault current Combined string current, cable ampacity, installation method Conductor size, termination torque and isolation
DC isolator Unsafe switching or arcing Maximum string voltage, current, poles and DC duty Correct device marking, enclosure and operation
Inverter AC circuit Cable overload and inverter output fault Maximum AC output, supply voltage, cable capacity and fault level Breaker rating, RCD arrangement and switchboard capacity
Battery circuit Very high short-circuit current Battery voltage, prospective fault current, cable length and manufacturer limits Fuse interrupt rating, polarity and protected routing

Good sizing is a coordinated design exercise: calculate the current, confirm the cable, select a device with the right DC or AC capability, and check every limit against the manufacturer’s data. A qualified Australian solar professional can then verify the installation against current standards, local network rules and the conditions at the property.

Use the module, inverter and switchgear manuals as primary sources, retain the commissioning records, and arrange an inspection whenever the system is expanded or modified. Careful protection design helps a PV system operate reliably from a suburban Melbourne roof to a remote Queensland homestead while keeping fault energy under control.